100m High Mast Flagpole Landmark Project in Uganda | EPC Contractor Support
Location: Kampala,Uganda
Cliet: Ministry of Defence,Uganda
Completion Date: June 2026
Specification: 100m Tapered Flagpole,Grade 304 Stainless Steel
Youtube 视频嵌入吊装、完工全景视频
Quisque commodo id mi non porttitor. Aenean sapien eros, commodo in lectus eu, auctor pretium diam. Mauris non orci quis est hendrerit laoreet id eget purus. Vivamus id ex non urna pulvinar consequat.
Project Background
This 100m landmark tapered flagpole serves as a core urban landmark in Kampala, Uganda.
The general contractor required an ultra-high flagpole with outstanding structural stability and long-term durability, capable of resisting local tropical high humidity and strong wind conditions.
All design and fabrication comply with international engineering standards to ensure safe long-term operation.
Our Scope of Supply & Service
- Structural design & technical drawing confirmation
- Manufacturing of the complete tapered flagpole system
- Internal electric hoist lifting system
- Anti-corrosion surface treatment
- Factory inspection & loading supervision
- Overseas technical guidance for installation
- Full Lifecycle Paid After-sales Technical Support
Project Challenges & Solutions
Adopt segmented modular design, reinforced customized packaging to prevent collision and structural deformation during sea freight.
Deliver complete professional hoisting plans and provide on-site technical guidance for seamless splicing.
Optimize wall thickness structure, adopt heavy-duty anti-corrosion treatment, fully meet local wind load design specifications.
CNC integrated rolling forming. Pre-assembly calibration is carried out before delivery. Custom flanges and factory testing for the wire rope lifting system are adopted.
Supply standardized foundation drawings and parameters. Professional engineers provide on-site installation guidance, installation manuals and vertical calibration support.
Adopt durable lifting accessories. Provide maintenance checklist, full lifecycle paid after-sales technical support and spare parts supply.
Project Results
- The 100‑meter landmark flagpole main body has been completed and delivered as scheduled.
- On‑site construction work went well, and relevant acceptance work is in progress.
- We strive to meet all structural‑safety and service‑life requirements put forward by the cooperating party.
- The landmark flagpole is available for subsequent commissioning work.